Odessa South Wastewater Treatment Facility
Odessa, TX
Beyond performed geotechnical investigation for the existing control building, which experienced significant exterior brick veneer cracking and differential settlement of the floor slab. Beyond identified the root cause of foundation support issues, and developed recommendations to restore the building to working condition.
Classifications: Municipal facilities, building, geotechnical engineering